EPC of a 230/34.5kV substation for a solar farm
Factory-Built Substation Projects
BESS & Renewable Interconnections
Our developer customer needed to meet an aggressive project schedule while remaining cost-competitive. Beta was the only design-build company to bid a Factory-Built Substation solution, which our customer decided was just what they needed.
By the time the project was ready for construction, the customer had little time left in their schedule. Thanks to Agile by Beta® and its accelerated approach, we were able to fit our on-site work into the tight timeframe.
When the project began experiencing last-minute subcontractor and procurement challenges and the owner made last-minute changes to the capacitor bank design, Beta team members stepped up and completed all the remaining work and redesigned the capacitor banks. This enabled our customer to meet their deadline and their commitment to the interconnecting utility.
No matter the challenge, we found solutions for our customer. And the customer successfully delivered a high-quality project on schedule to the project owner.
• Control wiring, analog communications and fiberoptics
• SCADA
• Construction of containment pit
• Fiber optics termination for optical ground wire
• Reinstallation of fence grounding
• Capacitor bank redesign